Filter Results

401 to 425 of 2751
final_findings_report_reduced
bridge and demolition of the WSHB.•Maintain long term transportation service equivalent to the WSHB, with designs that ...
0.00203653541 |
a/101335
final report pdf - reduced size
of a new bridge and demolition of the WSHB.•Maintain long term transportation service equivalent to the WSHB, with designs ...
0.00203653541 |
a/101334
sw_plan_015207
: • Modifying the City of Seattle’s Department of Planning and Development (DPD) demolition permit to ...
0.00203647371 |
a/113498
fortlawton_deis
, design development Year 3 (2020) MUP/building permit approval, begin demolition, grading and ...
0.00203647371 |
a/150976
cacfinalreportandrecommendations-2012-04-17
to submission of their respective Master Use Permit applications. Any proposal for a new structure greater than 4000 square ...
0.00203641877 |
a/77254
ova_partialspecifications
2021SEATTLE PUBLIC SCHOOLSVAN ASSELT SCHOOL ADDITIOND.Existing Items to Remain: Protect construction indicated to remain against damage and ...
0.00203627115 |
a/75394
2018-2023adoptedcip
and build the new Elliot Way and related projects. The City is also working with WSDOT on the demolition schedule for the ...
0.00203627115 |
a/62882
2015-2020adoptedcapitalimprovementprogram
(NPDES) permits, one for storm water and one for combined sewer system. The City is required, for example, to invest ...
0.00203626975 |
a/62333
daexh econstructionimpactsmitigationplan
and approved by the SDCI building official prior to demolition permit issuance (2015 Seattle Building ...
0.002036217 |
a/56229
seattle-go-2017-pos
irrevocably pledges to include in its budget and to levy taxes annually, without limitation as to rate or amount as ...
0.00203617918 |
a/58526
seattle city light 2019 os
by the Securities Depository or its participants of any amount in respect of principal of or interest on the Bonds, or any notice which is ...
0.002036011 |
a/58476
cacfinalreportandrecommendations-2009-02-03
of the Laurelon Terrace Condominiums, in accordance with SMC 23.34.124(B7) as follows: “New or expanded boundaries shall not be ...
0.00203588349 |
a/77084
3330_mercer_dr_hazmat_111706 final
activities. • Identified mitigation measures to avoid or control contaminated site effects on the project. Project Construction Effects and ...
0.00203588349 |
a/59268
2015-2020proposedcip
regulatory requirements. The City of Seattle must abide by the City's two National Pollutant Discharge Elimination System (NPDES) ...
0.0020358297 |
a/62368
seattlecpfeisnoappendices2016_0505
growth in terms of permits, demolitions rents and sales will help guide citywide investment and guide ...
0.00203565042 |
a/87658
southdowntownfinaleis
. However, similar to Pioneer Square, intentional disinvestment or litigation could potentially lead to the eventual granting of ...
0.00203565042 |
a/88171
2018srcchapter4
R301.2(1) shall meet the provisions of Section R322. Wood foundations shall be designed andinstalled in accordance with AWC PWF.Exception: ...
0.00203550723 |
a/97882
__2020-2025proposedcapitalimprovementprogram-final
Discharge Elimination System (NPDES) permits, one for storm water and one for combined sewer 14Overview 2020‐2025 Proposed  ...
0.00203543645 |
a/63267
__2020-2025 adopted capital improvement program - final
(NPDES) permits, one for storm water and one for combined sewer system. The City is required, for example, to invest hundre ...
0.00203543645 |
a/63251
seattle-ltgo-utgo-2017-os
of any records maintained by the Securities Depository or its participants of any amount in respect of principal of or interest on the ...
0.002035424 |
a/58543
seattle-drainage-pos-2017
to permit the successful bidder to comply with Rule 15c2-12. By submitting the successful proposal for the Bonds, the ...
0.002035424 |
a/58518
mimp_report_fy2021
permit for this property for SDCI review, as recommended by the SAC on April 2, 2019. • Leases: All University personnel ...
0.002035322 |
a/77263
2021swmanualvol4sourcecontrolclean
System (NPDES) Municipal Stormwater General Permit ● Washington State Department of Ecology (Ecology) Stormwater Management ...
0.002035322 |
a/96987
ova_drawings
TIMBER DIAPHRAGM DETAILSS6.4RENOVATION DETAILSS7.1TYPICAL METAL STUD DETAILS31MECHANICALMP0.01MECHANICAL PERMIT PLAN - ...
0.002035159 |
a/75391
backgroundreport
approval.Use, design and demolition approval is required before any building or other City permit or ...
0.0020351517 |
a/88142